DGA Ltd All articles
Delivery Notes

Five Quiet Expiries: Checking an Old Proposal Before It Leaves the Folder

DGA Ltd
Five Quiet Expiries: Checking an Old Proposal Before It Leaves the Folder

Photo: business proposal documents folder desk UK office autumn, via thumbs.dreamstime.com

Late November 2026 is the season of the recycled proposal. A client asks for something similar to last time. A deadline is tight. An old document is opened, the client name is changed and the fee table is adjusted. The structure may still be sound. The assumptions underneath it may not be.

A proposal is not a template. It is a set of promises about money, capacity, people, terms and boundaries. Those promises expire quietly. The following five checks take under five minutes in total. Each one is framed as a question, followed by a short note on what goes wrong when it is skipped.

1. Do the fee assumptions still match the work?

Question: Are the rates, day counts, expenses, VAT treatment and subcontractor costs still current for this brief?

An old proposal often carries old assumptions. A rate may have moved. A day count may have been built for a narrower scope. Expenses may have been quoted on a previous travel pattern. VAT may be stated as inclusive in one place and exclusive in another. If the fee table is reused without checking, the margin erodes quietly and the fee note becomes a negotiation.

Look for the validity date on the fee. If there is none, add one. If the assumptions have changed, either update the fee or state the change in the covering note. A proposal that is clear about what has moved is more credible than one that pretends nothing has.

2. Is the stated capacity still true?

Question: Does the team actually have the hours available in the proposed delivery window?

Capacity is the assumption most likely to be stale. The people who delivered the original work may now be on another engagement, on leave or working reduced hours. The delivery window may overlap with a known peak. A proposal that promises a start date without checking the resource calendar is not a plan. It is a hope with a logo.

Check the calendar, not the memory. Confirm annual leave, existing commitments and review capacity. If the window is tight, say so before the client accepts. It is easier to shape a start date at proposal stage than to explain a delay after appointment.

3. Are the named personnel still the ones who will deliver?

Question: Are the named roles, CV summaries, availability and substitution arrangements accurate today?

Clients buy people as much as they buy firms. An old proposal may name a lead who has since changed role, or list a team that has been reassigned. Reusing the names without confirmation creates a mismatch between the promise and the delivery. It can also create a contractual problem if the proposal forms part of the appointment.

Either confirm the names or remove them. Avoid vague substitutions such as a suitably qualified team unless the client has agreed to that approach. If a named person is central to the offer, confirm their availability in writing before the proposal is sent.

4. Do the referenced terms still say what we think?

Question: Are the insurance levels, policies, frameworks, certifications and standard terms referred to in the proposal still current and correctly versioned?

Referenced terms are easy to overlook because they are not usually written out in full. A proposal may point to a framework, an accreditation or a set of standard terms that has since been updated. Relying on an expired certificate or an old limitation clause is a quiet risk. It may not surface until a dispute or a procurement check.

Check the dates and versions. If the reference has changed, update it. If the client is relying on a specific term, attach it or quote it. A reference is only useful if it points to the right document.

5. Is the scope boundary still where the client thinks it is?

Question: Does the old exclusion list still match this brief, and is the boundary stated in one clear sentence?

Scope creep rarely begins with a deliberate overreach. It begins with a proposal that described the work in general terms and left the boundary to assumption. An old proposal may carry exclusions that made sense for a different client or a different phase. Reused without revision, those exclusions can either frighten the client or fail to protect the firm.

Rewrite the boundary for this brief. State what is included in one sentence, then list the material exclusions. If the client has asked for something adjacent to the original scope, say whether it is in or out. A clear boundary at proposal stage is cheaper than a change note later.

Reuse the structure, not the assumptions

The value of an old proposal is its architecture: the order of the argument, the shape of the fee table, the way the scope is introduced. The risk is in the details that were true once and are not true now. Five checks will not make a proposal perfect, but they will stop the most common quiet failures.

Before the document leaves the folder, give it an owner and a date. Confirm the fee, the capacity, the people, the references and the boundary. Then send it. Reuse is sensible. Reuse without checking is how a good proposal becomes a difficult engagement.

All Articles

Related Articles

Before the Deadline: Reading a Client's Fiscal Year as a Scheduling Document

Plain Words, Fewer Queries: Setting a Language Allowance for Client Papers

Plain Words, Fewer Queries: Setting a Language Allowance for Client Papers

The Second Reader: Designing Deliverables That Survive the Forward

The Second Reader: Designing Deliverables That Survive the Forward